
Portugal 281 Ultramarathon - PT 281+ 2027
Arrival window and first checkpoints free
The forecast arrives five days before the start.
Here you'll find the elevation profile and an estimated finish time based on your UTMB Index.
What's your time based on your UTMB?
Cut-off times and crew - Portugal 281 Ultramarathon - PT 281+ · 2027
| Aid station | Cum. km | Cum. D+ | Seg. km | Seg. D+ | Seg. D- | Crew | Cut-off | Access |
|---|---|---|---|---|---|---|---|---|
| Arrivée | 280.6 | 5,083 m | 280.6 | 5,083 m | 5,226 m | — | Sun 12:00 PM |
Data from the official race rules, checked for every edition. The race rules prevail. Positions are interpolated along the GPX track and are a guide, not official course marking.
What you'll find at each aid station
Aid station contents not documented.
Elevation profile
The course and its aid stations
Portugal 281 Ultramarathon - PT 281+: times, aid-station stops and fuelling needs by UTMB® Index
Between a UTMB® Index of 500 and 800, the estimated finish time on this race runs from 50h18 to 26h50, and the aid-station stop budget from 7h51 to 1h59. The longer the race, the more stops weigh: this is time you should plan to spend standing still, not only running.
SourceBelow a UTMB® Index of roughly 305, the overall cut-off of 66h00 is no longer reachable at the estimated pace.
| UTMB® Index | Estimated time | Of which stops | Night hours | Carbs | Fluid | Sodium | Cut-off margin |
|---|---|---|---|---|---|---|---|
| 500 | 44h58 to 50h18 | 7h51 | 20 | 2,858 g | 33.3 L | 23,816 mg | +18h22 |
| 550 | 41h27 to 46h23 | 6h39 | 20 | 2,635 g | 30.7 L | 21,957 mg | +22h05 |
| 600 | 38h27 to 43h01 | 5h41 | 20 | 2,444 g | 28.5 L | 20,366 mg | +25h16 |
| 650 | 34h57 to 39h05 | 4h41 | 20 | 2,221 g | 25.9 L | 18,510 mg | +28h59 |
| 700 | 31h47 to 35h33 | 3h40 | 16.7 | 2,020 g | 23.6 L | 16,832 mg | +32h20 |
| 750 | 29h13 to 32h41 | 2h45 | 14 | 1,857 g | 21.7 L | 15,477 mg | +35h03 |
| 800 | 26h50 to 30h02 | 1h59 | 11.4 | 1,706 g | 19.9 L | 14,217 mg | +37h34 |
Figures based on 60 g of carbohydrate, 700 mL of fluid and 500 mg of sodium per hour, "average" preparation and mild conditions (15–25 °C). Above 25 °C, count on roughly 900 mL/h and 700 mg/h. Carbohydrate intake is trained: 60 g/h is a floor, 90 g/h assumes a glucose-fructose blend and a gut used to it.
Other trails worth preparing for
Sources and method
- Time projection — times by UTMB Index are taken from the actual splits of runners in each level band on previous editions of this race, aid station stops included. No formula is used as long as these results exist.
- Trail nutrition — hourly targets for carbohydrate, fluid and sodium follow the commonly accepted ultra-endurance guidance. La Clinique du Coureur — Fuelling in trail running
- Course, aid stations and cut-offs — taken from the event's official rules, which prevail in case of any discrepancy. Official site — Portugal 281 Ultramarathon - PT 281+
Weather for Portugal 281 Ultramarathon - PT 281+
The weather for Portugal 281 Ultramarathon - PT 281+ will appear here as soon as the forecast models reach that date, around five days before the start: feels-like temperature, rain, snow, wind and storms, section by section and at your passage time.
Detailed weather for Portugal 281 Ultramarathon - PT 281+, hour by hour on the courseFrequently asked questions
How many checkpoints?
Portugal 281 Ultramarathon - PT 281+ has 1 checkpoint: 1 checkpoint with undocumented contents. Details are in the two tables above.
How do I find the exact location of an aid station?
The Google Maps icon in the “Access” column opens the aid station's location: handy for planning your crew's routes.
What distance and elevation gain?
Portugal 281 Ultramarathon - PT 281+ is 281 km long with 5083 m of elevation gain.
How long to finish?
With a UTMB index of 600 (average runner), one runner in two finishes Portugal 281 Ultramarathon - PT 281+ between 38h27 and 43h01.
What's the weather forecast?
The weather for Portugal 281 Ultramarathon - PT 281+ will be published on this page around five days before the start, once the forecast models reach the race date. It will be detailed section by section: feels-like temperature, rain, snow, wind and storms.