
Malaysia Ultra-Trail - MALAYSIA100 2026
The forecast arrives five days before the start.
Here you'll find the elevation profile, an estimated finish time based on your UTMB Index and details of the 9 aid stations to plan your nutrition and hydration segment by segment.
What's your time based on your UTMB?
Times estimated by the RAVIT model, learned from real ultra-trail finish times. Enter your UTMB Index (utmb.world) to get a personalized estimate.
Cut-off times and crew - Malaysia Ultra-Trail - MALAYSIA100 · 2026
Data from the official race rules, checked for every edition. The race rules prevail. Positions are interpolated along the GPX track and are a guide, not official course marking.
What you'll find at each aid station
| Product | Angkasakm 12.5 | Maxwell Basecampkm 22.1 | Tiger Templekm 29.6 | Spritzer Ecoparkkm 37.5 | KTM Tunnelkm 50.1 | Changkat Ibol Junctionkm 62.6 | Peak 300km 72.1 | Angkasakm 86.4 | Finishkm 99.2 |
|---|---|---|---|---|---|---|---|---|---|
| Water | available | available | available | available | available | available | available | available | available |
| Brand products · Näak | available | available | available | available | available | available | available | available | unavailable |
| Hot meal | unavailable | unavailable | unavailable | unavailable | unavailable | unavailable | unavailable | unavailable | available |
La feuille de ton assistance pour Malaysia Ultra-Trail - MALAYSIA100 · 2026
Ton assistance peut te voir à ces postes. Ton plan RAVIT y met tes heures, ce qu'elle te tend et la route pour y aller.
Recto, verso et planche d'étiquettes, en PDF : l'exemple d'une coureuse de l'UTMB.
Elevation profile
The course and its aid stations
Malaysia Ultra-Trail - MALAYSIA100: times, aid-station stops and fuelling needs by UTMB® Index
Between a UTMB® Index of 500 and 800, the estimated finish time on this race runs from 23h38 to 13h50. These times include aid-station stops: they come from real durations between two timing points, and this race's timing does not measure stops separately.
SourceBelow a UTMB® Index of roughly 305, the overall cut-off of 32h00 is no longer reachable at the estimated pace.
| UTMB® Index | Estimated time | Night hours | Carbs | Fluid | Sodium | Cut-off margin |
|---|---|---|---|---|---|---|
| 500 | 23h38 | 9.6 | 1,418 g | 16.5 L | 11,817 mg | +8h22 |
| 550 | 20h29 | 6.5 | 1,229 g | 14.3 L | 10,242 mg | +11h31 |
| 600 | 17h48 | 4 | 1,068 g | 12.5 L | 8,900 mg | +14h12 |
| 650 | 16h56 | 4 | 1,016 g | 11.9 L | 8,467 mg | +15h04 |
| 700 | 15h56 | 4 | 956 g | 11.2 L | 7,967 mg | +16h04 |
| 750 | 14h55 | 4 | 895 g | 10.4 L | 7,458 mg | +17h05 |
| 800 | 13h50 | 4 | 830 g | 9.7 L | 6,917 mg | +18h10 |
Figures based on 60 g of carbohydrate, 700 mL of fluid and 500 mg of sodium per hour, "average" preparation and mild conditions (15–25 °C). Above 25 °C, count on roughly 900 mL/h and 700 mg/h. Carbohydrate intake is trained: 60 g/h is a floor, 90 g/h assumes a glucose-fructose blend and a gut used to it.
Measured on the 2026 edition: the field checkpoint by checkpoint
230 starters, 24.8% DNF rate, 18 timed checkpoints.
| Segment | km | Median | Middle half | Measured |
|---|---|---|---|---|
| Start - Jalan Kota → Murugan Temple - VK Start | 4.4 | 34 min | 29 min – 37 min | 227 |
| Murugan Temple - VK Start → AS1 Angkasa | 12.4 | 2 h 58 | 2 h 38 – 3 h 20 | 227 |
| AS1 Angkasa → AS2 Maxwell BaseCamp IN | 21.5 | 1 h 23 | 1 h 11 – 1 h 37 | 223 |
| AS2 Maxwell BaseCamp IN → AS2 Maxwell BaseCamp OUT | 21.5 | 7 min | 4 min – 12 min | 220 |
| AS2 Maxwell BaseCamp OUT → AS3 Tiger Temple IN | 28.9 | 1 h 29 | 1 h 17 – 1 h 38 | 221 |
| AS3 Tiger Temple IN → AS3 Tiger Temple OUT | 28.9 | 9 min | 6 min – 14 min | 211 |
| AS3 Tiger Temple OUT → AS4 Spritzer EcoPark IN | 36.7 | 1 h 36 | 1 h 17 – 1 h 50 | 209 |
| AS4 Spritzer EcoPark IN → AS4 Spritzer EcoPark OUT | 36.7 | 18 min | 10 min – 25 min | 213 |
| AS4 Spritzer EcoPark OUT → AS5 KTM Tunnel | 49.2 | 2 h 55 | 2 h 27 – 3 h 23 | 212 |
| AS5 KTM Tunnel → AS6 Changkat Ibol IN | 61.7 | 2 h 44 | 2 h 14 – 3 h 01 | 196 |
| AS6 Changkat Ibol IN → AS6 Changkat Ibol OUT | 61.7 | 48 min | 28 min – 1 h 04 | 187 |
| AS6 Changkat Ibol OUT → AS7 U-Turn Kuning Sari | 66 | 1 h 08 | 59 min – 1 h 16 | 186 |
| AS7 U-Turn Kuning Sari → AS8 Peak 300 50/100 IN | 70.8 | 1 h 20 | 1 h 07 – 1 h 30 | 186 |
| AS8 Peak 300 50/100 IN → AS8 Peak 300 OUT | 70.8 | 20 min | 10 min – 28 min | 181 |
| AS8 Peak 300 OUT → AS9 Angkasa | 85.2 | 6 h 36 | 5 h 05 – 7 h 22 | 176 |
| AS9 Angkasa → AS10 Maxwell BaseCamp IN | 94.3 | 1 h 55 | 1 h 32 – 2 h 13 | 172 |
| AS10 Maxwell BaseCamp IN → AS 10 Maxwell BaseCamp OUT | 94.3 | 1 min | 1 min – 2 min | 172 |
| AS 10 Maxwell BaseCamp OUT → Finish - Jalan Kota | 97.5 | 31 min | 25 min – 36 min | 173 |
Where runners drop out. AS5 KTM Tunnel (16) · AS8 Peak 300 OUT (6) · AS1 Angkasa (6) out of 57 total DNFs.
RAVIT record from the official timing of the 2026 edition, data from September 15, 2026.
SourceMalaysia Ultra-Trail - MALAYSIA100 over the years
Sources and method
- Time projection — times by UTMB Index are taken from the actual splits of runners in each level band on previous editions of this race, aid station stops included. No formula is used as long as these results exist.
- Trail nutrition — hourly targets for carbohydrate, fluid and sodium follow the commonly accepted ultra-endurance guidance. La Clinique du Coureur — Fuelling in trail running
- Course, aid stations and cut-offs — taken from the event's official rules, which prevail in case of any discrepancy. Official site — Malaysia Ultra-Trail - MALAYSIA100
Weather for Malaysia Ultra-Trail - MALAYSIA100
The weather for Malaysia Ultra-Trail - MALAYSIA100 will appear here as soon as the forecast models reach that date, around five days before the start: feels-like temperature, rain, snow, wind and storms, section by section and at your passage time.
Detailed weather for Malaysia Ultra-Trail - MALAYSIA100, hour by hour on the courseFrequently asked questions
How many checkpoints?
Malaysia Ultra-Trail - MALAYSIA100 has 9 checkpoints: 9 aid stations. Details are in the two tables above.
What's the longest segment without aid?
The one leading to Angkasa: 14.3 km and 0 m elevation gain. That's the one to load up for first.
How do I find the exact location of an aid station?
The Google Maps icon in the “Access” column opens the aid station's location: handy for planning your crew's routes.
What distance and elevation gain?
Malaysia Ultra-Trail - MALAYSIA100 is 99 km long with 6143 m of elevation gain.
How long to finish?
With a UTMB Index of 600 (average runner), the estimated time is around 17h48 for Malaysia Ultra-Trail - MALAYSIA100.
What's the weather forecast?
The weather for Malaysia Ultra-Trail - MALAYSIA100 will be published on this page around five days before the start, once the forecast models reach the race date. It will be detailed section by section: feels-like temperature, rain, snow, wind and storms.
Want to stack the odds in your favor for Malaysia Ultra-Trail - MALAYSIA100?
In 2 minutes, RAVIT generates your complete plan: segment-by-segment time, carbs, water and sodium at every aid station, printable roadbook.
No card required · Instant results