Cover photo of Malaysia Ultra-Trail - MALAYSIA50 2027 — 54 km, 2028 m elevation gain

Malaysia Ultra-Trail - MALAYSIA50 2027

September 4, 2027
Distance
54.4 km
Elevation gain
2028 m
Download the GPXVersion from September 29, 2026, updated by RAVITOfficial race website

Arrival window and first checkpoints free

Course weather at your time of passage

The forecast arrives five days before the start.

Here you'll find the elevation profile, an estimated finish time based on your UTMB Index and details of the 7 aid stations to plan your nutrition and hydration segment by segment.

What's your time based on your UTMB?

Predicted race time based on your UTMB Index® and the times achieved in past editions.

UTMB Index®
Normal
3005007009001000UTMB Index®
SourceUTMB® Index

Share my goal

XBlueskyWhatsAppFacebook

Cut-off times and crew - Malaysia Ultra-Trail - MALAYSIA50 · 2027

54 km race checkpoints: kilometers, elevation, crew, cut-off time and access
Aid stationCum. kmCum. D+Seg. kmSeg. D+Seg. D-CrewCut-offAccess
Tiger Temple9.6401 m9.6401 m387 mForbidden—
Spritzer EcoPark17.4786 m7.7385 m399 mAllowed—
KTM Tunnel23.1941 m5.7155 m152 mForbidden—
Changkat Ibol35.51,187 m12.4246 m239 mAllowedSat 03:00 PM
U-turn Kuning Sari39.71,435 m4.2248 m251 mForbidden—
Peak 30042.21,613 m2.5178 m28 mForbidden—
Finish54.42,027 m12.2414 m570 m—Sat 10:00 PM
Updated on 10/22/2026 by RAVIT

Data from the official race rules, checked for every edition. The race rules prevail. Positions are interpolated along the GPX track and are a guide, not official course marking.

What you'll find at each aid station

Aid station contents: products in rows, aid stations in columns
ProductTiger Templekm 9.6Spritzer EcoParkkm 17.4KTM Tunnelkm 23.1Changkat Ibolkm 35.5U-turn Kuning Sarikm 39.7Peak 300km 42.2Finishkm 54.4
Wateravailableavailableavailableavailableavailableavailableavailable
Brand products · Näakavailableavailableavailableavailableavailableavailableunavailable
Hot mealunavailableunavailableunavailableunavailableunavailableunavailableavailable
Updated on 10/22/2026 by RAVIT

Your crew sheet for Malaysia Ultra-Trail - MALAYSIA50 · 2027

Your crew can see you at these aid stations. Your RAVIT plan sets your times, what they hand you, and the route to get there.

  • Spritzer EcoParkkm 17.4
  • Changkat Ibolkm 35.5

Front, back, and label sheet, as PDF: an example from a UTMB runner.

Elevation profile

100 M200 M300 MS01 · Tiger Temple KM 9.6 — Alt 31 m D+ cumulé 401 m9.6 KMTiger TempleS02 · Spritzer EcoPark KM 17.4 — Alt 18 m D+ cumulé 786 m17.4 KMSpritzer EcoParkS03 · KTM Tunnel KM 23.1 — Alt 23 m D+ cumulé 941 m23.1 KMKTM TunnelS04 · Changkat Ibol KM 35.5 — Alt 27 m D+ cumulé 1187 m35.5 KMChangkat IbolS05 · U-turn Kuning Sari KM 39.7 — Alt 27 m D+ cumulé 1435 m39.7 KMU-turn Kuning SariS06 · Peak 300 KM 42.2 — Alt 180 m D+ cumulé 1613 m42.2 KMPeak 300Start0 KMFinish54.4 KM

The course and its aid stations

Loading track…
GPX

Malaysia Ultra-Trail - MALAYSIA50: times, aid-station stops and fuelling needs by UTMB® Index

Between a UTMB® Index of 500 and 800, the estimated finish time on this race runs from 8h44 to 4h41, and the aid-station stop budget from 0h15 to 0h05. The longer the race, the more stops weigh: this is time you should plan to spend standing still, not only running.

SourceUTMB® Index
0h000h110h210h320h423005007009001000UTMB® Index
Estimated time, stop time and fuelling needs on Malaysia Ultra-Trail - MALAYSIA50 by UTMB Index
UTMB® IndexEstimated timeOf which stopsNight hoursCarbsFluidSodiumCut-off margin
5007h48 to 8h440h152496 g5.8 L4,132 mg+7h44
5507h08 to 7h580h122453 g5.3 L3,775 mg+8h27
6006h25 to 7h110h102408 g4.8 L3,397 mg+9h12
6505h56 to 6h380h082377 g4.4 L3,139 mg+9h43
7005h27 to 6h050h072346 g4 L2,884 mg+10h14
7505h03 to 5h390h062321 g3.7 L2,673 mg+10h39
8004h41 to 5h150h052298 g3.5 L2,484 mg+11h02

Figures based on 60 g of carbohydrate, 700 mL of fluid and 500 mg of sodium per hour, "average" preparation and mild conditions (15–25 °C). Above 25 °C, count on roughly 900 mL/h and 700 mg/h. Carbohydrate intake is trained: 60 g/h is a floor, 90 g/h assumes a glucose-fructose blend and a gut used to it.

Measured on the 2026 edition: the field checkpoint by checkpoint

756 starters, 6.1% DNF rate, 11 timed checkpoints.

Duration of each segment on edition 2026: median and middle half of field
SegmentkmMedianMiddle halfMeasured
Start - Jalan Kota → AS3 Tiger Temple IN9.61 h 421 h 30 – 1 h 57751
AS3 Tiger Temple IN → AS3 Tiger Temple OUT9.66 min4 min – 8 min749
AS3 Tiger Temple OUT → AS4 Spritzer EcoPark IN17.31 h 231 h 12 – 1 h 36750
AS4 Spritzer EcoPark IN → AS4 Spritzer EcoPark OUT17.39 min6 min – 13 min747
AS4 Spritzer EcoPark OUT → AS5 KTM Tunnel231 h 0455 min – 1 h 15745
AS5 KTM Tunnel → AS6 Changkat Ibol IN35.32 h 221 h 59 – 2 h 43738
AS6 Changkat Ibol IN → AS6 Changkat Ibol OUT35.321 min11 min – 33 min722
AS6 Changkat Ibol OUT → AS7 U-Turn Kuning Sari39.51 h 0759 min – 1 h 20725
AS7 U-Turn Kuning Sari → AS8 Peak 300 50/100 IN41.739 min32 min – 48 min717
AS8 Peak 300 50/100 IN → AS8 Peak 300 OUT42.28 min5 min – 12 min704
AS8 Peak 300 OUT → Finish - Jalan Kota543 h 072 h 34 – 3 h 38698

Where runners drop out. AS6 Changkat Ibol IN (14) · AS7 U-Turn Kuning Sari (11) · AS8 Peak 300 OUT (7) out of 46 total DNFs.

RAVIT record from the official timing of the 2026 edition, data from September 15, 2026.

SourceLiveTrail
See segment-by-segment analysis of Malaysia Ultra-Trail - MALAYSIA50

In the 2027 ranking

Malaysia Ultra-Trail - MALAYSIA50 is 54 km and 2,028 m of elevation gain, that's 74 km-effort: category S, among 501 races in 2027. Its time limit of 16 h requires a minimum speed of 3.4 km/h: rank 66 out of 451 of the widest cut-off times in S.

S trails 2027: 45 to 74 km-effort

Similar effort in 2027

Other trails worth preparing for

Malaysia Ultra-Trail - MALAYSIA50 over the years

Sources and method

  • Time projection — times by UTMB Index are taken from the actual splits of runners in each level band on previous editions of this race, aid station stops included. No formula is used as long as these results exist.
  • Trail nutrition — hourly targets for carbohydrate, fluid and sodium follow the commonly accepted ultra-endurance guidance. La Clinique du Coureur — Fuelling in trail running
  • Course, aid stations and cut-offs — taken from the event's official rules, which prevail in case of any discrepancy. Official site — Malaysia Ultra-Trail - MALAYSIA50

Weather for Malaysia Ultra-Trail - MALAYSIA50

The weather for Malaysia Ultra-Trail - MALAYSIA50 will appear here as soon as the forecast models reach that date, around five days before the start: feels-like temperature, rain, snow, wind and storms, section by section and at your passage time.

Detailed weather for Malaysia Ultra-Trail - MALAYSIA50, hour by hour on the course

Frequently asked questions

How many checkpoints?

Malaysia Ultra-Trail - MALAYSIA50 has 7 checkpoints: 7 aid stations. Details are in the two tables above.

What's the longest segment without aid?

The one leading to Changkat Ibol: 12.4 km and 246 m elevation gain. That's the one to load up for first.

How do I find the exact location of an aid station?

The Google Maps icon in the “Access” column opens the aid station's location: handy for planning your crew's routes.

What distance and elevation gain?

Malaysia Ultra-Trail - MALAYSIA50 is 54 km long with 2028 m of elevation gain.

How long to finish?

With a UTMB index of 600 (average runner), one runner in two finishes Malaysia Ultra-Trail - MALAYSIA50 between 6h25 and 7h10.

What's the weather forecast?

The weather for Malaysia Ultra-Trail - MALAYSIA50 will be published on this page around five days before the start, once the forecast models reach the race date. It will be detailed section by section: feels-like temperature, rain, snow, wind and storms.

Want to stack the odds in your favor for Malaysia Ultra-Trail - MALAYSIA50?

RAVIT calculates your race plan at your UTMB Index: segment time, carbs, water and sodium at each aid station.

Arrival window and first checkpoints free